Maintenance notes for water supply system of concrete mixing plant in winter 2021-12-09 10:53:54

The cold climate and environmental conditions pose a severe challenge to the use of concrete mixing plant equipment. In order to make the mixing plant operate smoothly under bad weather conditions, how should we maintain the water supply system of concrete mixing plant in winter?


Maintenance notes for water supply system of concrete mixing plant in winter:


1. The water pump shall be lubricated regularly as required;


2. When the water pump is out of use for a long time, it is necessary to drain the water in the pipe. If a stop valve is installed, pay special attention to emptying the water at the stop valve;


3. Ensure the normal flow of water in the pipe in winter, and add insulation pipes to prevent freezing;


4.Check the joints of water supply pipes regularly, because water is easy to accumulate at the joints.

Post précédent
Bulletin d’information

Inscrivez-vous recevoir des informations sur la compagnie

Droit d\'auteur © 2015-2024 Fujian Xinda Machinery Co., Ltd..Tous droits réservés.Alimenté par dyyseo.com

whatsapp : 008615905062290

Tél. : 008615905062290

Messagerie : xd@xdmac.com

contacts Accueil